Back to Course
Aseptic Processing / Sterile Compounding Course with NO CE
0% Complete
0/0 Steps
-
Engineering Controls and Facility Design Demo12 Topics|11 Quizzes
-
Facility and Engineering Controls Vocabulary
-
Facility Basics
-
Facility Design
-
Secondary Engineering Controls
-
Secondary Engineering Controls – Part 2
-
Primary Engineering Controls
-
First Air and Maintenance BSC
-
First Air and Maintenance LAFW
-
Airflow Visualization
-
Airflow Visualization – part 2
-
Contamination Control – The 6 Ms
-
Contamination Control part 2 – Mitigating the 6 Ms
-
Facility and Engineering Controls Vocabulary
-
Garbing for the Cleanroom Demo10 Topics|10 Quizzes
-
Cleaning and Disinfection of the Cleanroom Demo10 Topics|9 Quizzes
-
Cleaning and Sanitization of the Cleanroom Vocabulary
-
Introduction to Cleaning and Disinfection
-
Cleaning and Disinfecting Agents
-
Cleaning Frequency and Order
-
Cleaning and Disinfection Techniques
-
Cleaning Materials and Equipment
-
Cleaning and Disinfecting Primary Engineering Control – LAFW
-
Deactivate, Decontaminate, Cleaning and Disinfecting a BSC
-
Cleaning After a Worst Case Event – Triple Clean
-
Assessing Cleaning and Disinfection Efficacy
-
Cleaning and Sanitization of the Cleanroom Vocabulary
-
Proper Compounding Aseptic Technique6 Topics|5 Quizzes
-
Cleanroom Environmental Monitoring11 Topics|11 Quizzes
-
Interpreting Cleanroom Certification Reports1 Topic
-
Handling Hazardous Drugs14 Topics|1 Quiz
-
Handling Hazardous Drugs – Standards and Regulations
-
Handling Hazardous Drugs – Types of Exposure
-
Handling Hazardous Drugs – Facility Design and Engineering Controls
-
Handling Hazardous Drugs – Personal Protective Equipment
-
Handling Hazardous Drugs – Proper PPE in Certain Scenarios
-
Handling Hazardous Drugs – Verifying Chemo Compounding Technique
-
Handling Hazardous Drugs – Hazard Communication Plan
-
Handling Hazardous Drugs – Chemo Spill Cleanup
-
Handling Hazardous Drugs – Environmental Wipe Sampling
-
Handling Hazardous Drugs – Medical Surveillance
-
Handling Hazardous Drugs – HD List and Assessment of Risk
-
Handling Hazardous Drugs – Workflow Strategies for Hazardous Drug Handling
-
Handling Hazardous Drugs – Designated Person SOPs and Documentation
-
Handling Hazardous Drugs – Final Quiz
-
Handling Hazardous Drugs – Standards and Regulations
Quizzes
Participants 16648
Quiz 4 of 53
Engineering Controls – SECs Part 2 Quiz
Seth DePasquale, R.Ph., BCSCP September 8, 2020
Time limit: 0
Quiz Summary
0 of 3 Questions completed
Questions:
Information
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading…
You must sign in or sign up to start the quiz.
You must first complete the following:
Results
Quiz complete. Results are being recorded.
Results
0 of 3 Questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
Categories
- Engineering Controls and Facility Design 0%
- 1
- 2
- 3
- Current
- Review
- Answered
- Correct
- Incorrect
-
Question 1 of 3
1. Question
When we have a negatively pressured environment it’s important to:
CorrectIncorrect -
Question 2 of 3
2. Question
Materials used in the construction of our Secondary Engineering Controls (our room) should be smooth, non-shedding, impervious and be made of stainless steel.
CorrectIncorrect -
Question 3 of 3
3. Question
Our non-hazardous Secondary Engineering Controls should have a minimum differential positive pressure of:
CorrectIncorrect